Print Page
Image is for illustrative purposes only. Please refer to product description.

ManufacturerABB - KOPEX
Manufacturer Part No7TCA297090R0128Copy
Manufacturer Standard Lead Time11 weeks
Order Code3464959
Also Known AsHAMM0404G1
Your Part Number
14 total stock globally
16 more incoming. You can reserve stock now
14 Delivery in 3-5 Business Days(UK stock)
| Quantity | Price (Incl GST) |
|---|---|
| 1+ | $300.110 ($345.1265) |
| 5+ | $278.540 ($320.321) |
| 10+ | $256.960 ($295.504) |
| 25+ | $247.770 ($284.9355) |
| 50+ | $245.890 ($282.7735) |
| 100+ | $240.970 ($277.1155) |
Price for:Each
Minimum: 1
Multiple: 1
$300.11 ($345.13 inc GST)
Line Note
Added to your Order Confirmation, Invoice, and Dispatch note for this order only.
Product Information
ManufacturerABB - KOPEX
Manufacturer Part No7TCA297090R0128Copy
Manufacturer Standard Lead Time11 weeks
Order Code3464959
Also Known AsHAMM0404G1
Technical Datasheet
Conduit ConfigurationStraight
Trade Size-
Conduit MaterialBrass
Conduit ColourMetallic
External Length-
IP / NEMA RatingIP66
Product Range-
Technical Specifications
Conduit Configuration
Straight
Conduit Material
Brass
External Length
-
Product Range
-
Trade Size
-
Conduit Colour
Metallic
IP / NEMA Rating
IP66
Technical Docs (1)
Legislation and Environmental
Country of Origin:
Country in which last significant manufacturing process was carried outCountry of Origin:Great Britain
Country in which last significant manufacturing process was carried out
Country in which last significant manufacturing process was carried outCountry of Origin:Great Britain
Country in which last significant manufacturing process was carried out
Tariff No:74122000
US ECCN:EAR99
EU ECCN:NLR
RoHS Compliant:Yes
RoHS
RoHS Phthalates Compliant:Yes
RoHS
Download Product Compliance Certificate
Product Compliance Certificate
Weight (kg):.38
